Community Alliance Church
Project Description:
Paul Yoe executed this project as project manager for Cogun Inc.
New Addition of 960 Seat Contemporary Worship Hall. Additions and Alterations for
87,000 School, Office, Café, Book Store and Library. Addition of a new two story
elevator and reconfiguration of Lobby, Entry and Handicapped Access. Addition for
New Children’s North Wing, including Educational Class Rooms, Infants and Toddler
Area. Alterations and configuration of Secure Entry for Children’s Lobby and Security
for all School Access. Reconfiguring and additions of Men’s and Women’s Bathroom
facilities and Handicapped and Family Bathrooms.
All Pre Construction Project and Program Management working to control the Time,
Scope Cost and Quality. Paul Yoe effectively managed the Architectural & Engineering
Design and Scope, working with Jim Sampey Architect and HRG Engineers. Collaborative
efforts and open communication with Center Township, Planning, Zoning and Township
Engineers. This open and collaborative effort allowed Community Alliance Officials
under the direction of Paul Yoe and in association of George Shockey Excavating
to restructure the Strom Water Management Plan and associated cost structures. Paul
Yoe and George Shockey were able to save Hundreds of Thousands of dollars.
Image Gallery:
Work Completed:
- Installation of New Elevator & Two Elevators Lobbies
- Installation of New Electrical Service
- Significant increase and parking
- Addition of Children’s North Wing
- Addition of New 960 Seat Worship Hall
- Addition of New Café, Library and Bookstore
- Installation of Secure School and Children Check in
- Addition of New Audio Visual Systems thru entire facility
- Addition of Visitor Center and Meeting Room
- Installation of 1.25 miles of new Sanitary Sewer
- Installation of New Wet Fire Sprinkler System
- Installation of New Fire Alarm System
- Design and Construction of New Custom wood stage floor